1. Purchase Prices and Other Details for FY2024 Onward

*Regarding procurement prices, a consumption tax is added to the relevant prices if FIT-certified businesses are taxable enterprises. The relevant prices include a consumption tax if FIT-certified businesses are tax-exempt enterprises.

*An amount equivalent to the surcharge on the generator side is added to the purchase price if maximum power receiving is 10 kW or more.

(1) Solar power generation

①Solar power generation for homes and businesses (Ineligible for bidding)

Power source Scale (Reference)
FY2023
1st Half
(Reference)
FY2023
2nd Half
FY2024 FY2025
Solar power generation for homes Less than
10kW
16yen 16yen 15yen
Solar power generation for businesses
(Ground installation)
10kW
or more
less than
50kW
10yen 10yen 10yen
50kW or more
Ineligible for bidding
9. 5yen 9.2yen 8.9yen
Solar power generation for businesses
(Roof installation)
10kW
or more
less than
50kW
10yen 12yen 12yen 11.5yen
50kW or more 9.5yen

Note: In the FIT scheme, regional utilization requirements for self-consumption types have been set with regard to solar power generation for businesses (10 kW to under 50 kW.)

②Solar power generation for businesses (Eligible for bidding)

Bidding will be conducted to decide the FY2023 purchase price. In FY2024, eligibility for bidding will be 250 kW or more for FIP certification. (Roof installation will be exempted from bidding.) Bids will be invited four times in FY2024, and the upper limit of the bid will be 9.20 yen, 9.13 yen, 9.05 yen and 8.98 yen respectively.

(2)Wind power generation

①Onshore wind power generation(Under 50kW)

Power source Scale (Reference)
FY2023
(Reference)
FY2024
(Reference)
FY2025
FY2026
Onshore wind power
generation
Less than 50kW 15yen 14yen 13yen 12yen

Note: In the FIT scheme, regional utilization requirements for self-consumption and regional-integration types have been set.

②Onshore wind power generation (50 kW or more)

Bidding will be conducted to decide the FY2024 purchase price. One round of bidding will be conducted in FY2024, with the upper limit of the bid being 14 yen. However, if the bidding capacity exceeds 1.3 GW, an additional round of bidding will be conducted within the fiscal year. The upper limit of the bid for it will be the higher of the following: 14 yen, or a weighted average of the winning bids in the other rounds of bidding conducted that year.

③Onshore wind power generation (Replacements)

Power source Scale (Reference)
FY2023
FY2024
Onshore wind power generation (Replacements) Every scale 13yen 12yen

Note: In the FIT scheme, regional utilization requirements for self-consumption and regional-integration types have been set.

④Bottom-mounted offshore wind power generation (Not covered by the Act on Promoting Utilization of Sea Areas for the Development of Marine Renewable Energy Power Generation Facilities)

Bidding will be conducted to decide the FY2023 purchase price. The upper limit of the bid will not be published beforehand.

⑤Floating offshore wind power generation (Not covered by the Act on Promoting Utilization of Sea Areas for the Development of Marine Renewable Energy Power Generation Facilities)  

Power source Scale (Reference)
FY2023
(Reference)
FY2024
(Reference)
FY2025
FY2026
Floating offshore wind power
generation
Every scale 36yen 36yen

(3)Geothermal power generation

Power source Scale (Reference)
FY2023
(Reference)
FY2024
(Reference)
FY2025
FY2026
Geothermal power generation Less than1,000kW 40yen 40yen
1,000kW or more
Less than 15,000kW
40yen Variable in line with generating power
15,000kW or more
Less than 30,000kW
26yen
30,000kW or more 26yen 26yen
Geothermal power generation
(With all facilities updated)
Less than1,000kW 30yen 30yen
1,000kW or more
Less than15,000kW
30yen Variable in line with generating power
15,000kW or more
Less than 30,000kW
20yen
30,000kW or more 20yen 20yen
Geothermal power generation
(With original underground facilities used as they are)
Less than1,000kW 19yen 19yen
1,000kW or more
Less than15,000kW
19yen Variable in line with generating power
15,000kW or more
Less than 30,000kW
12yen
30,000kW or more 12yen 12yen

Note: In the FIT scheme, regional utilization requirements for self-consumption and regional-integration types have been set.

Note: In the scale of 1,000 kW and less than 30,000 kW, the price (generating power x kW) is calculated by the following formula:

purchase price for less than 1,000kW = a yen/kWh
purchase price for 30,000kW = b yen/kWh

photo

(4)Small- and medium-sized hydroelectric power generation

Power source Scale (Reference)
FY2023
(Reference)
FY2024
FY2025 FY2026
Small- and medium-sized hydroelectric power generation Less than 200kW 34yen 34yen
200kW or more
Less than 1,000k
29yen 29yen
1,000kW or more
Less than 5,000kW
27yen 23yen -
5,000kW or more
Less than 30,000kW
16yen 16yen -
Small- and medium-sized hydroelectric power generation
(Utilizing existing water conduits)
Less than 200kW 25yen 25yen
200kW or more
Less than 1,000kW
21yen 21yen
1,000kW or more
Less than 5,000kW
15yen 14yen -
5,000kW or more
Less than 30,000kW
9yen 9yen -

Note: In the FIT scheme, regional utilization requirements for self-consumption and regional-integration types have been set.

(5)Biomass power generation

①Biomass power generation (Ineligible for bidding)

Power source Scale (Reference)
FY2023
(Reference)
FY2024
FY2025
Biomass power generation
(General timber, etc.)
Less than10,000kW 24yen 24yen
Biomass power generation
(Unused materials)
Less than 2,000kW 40yen 40yen
2,000kW or more 32yen 32yen
Biomass power generation
(Construction material waste products)
All scales 13yen 13yen
Biomass power generation
(General waste products / other)
All scales 17yen 17yen
Biomass power generation
(Biogas from methane fermentation)
All scales 35yen 35yen

Note: In the FIT scheme, regional utilization requirements for self-consumption and regional-integration types have been set.

②Biomass power generation using general timber, etc. (Over 10,000 kW) / Biomass liquid fuel (Every scale)

Bidding will be conducted to decide the FY2024 purchase price. The upper limit of the bid will not be published beforehand.

(Reference)Graphic showing FIT/FIP Schemes and Bid Eligibility

photo

*1) The FIP scheme is permitted for commercial solar power under 50 kW if certain conditions are met.

*2) Replacements are ineligible for bidding, and under 1,000 kW, either FIT or FIP can be selected.

*3) For floating offshore wind power, either FIT or FIP can be selected.

Note: In addition, for supply areas such as the Okinawa region and remote islands, FIT can be selected without regional utilization requirements.

photo

*1) Replacement geothermal and small and medium-sized hydroelectric power generation facilities will be handled the same as new ones.

Note: For supply areas such as the Okinawa region and remote islands, FIT can be selected without regional utilization requirements for any the power sources.

*2) Biomass power generation (excluding liquid fuels) installed in waste incineration facilities can be selected as FIT (with regional utilization requirements) or FIP (Ineligible for bidding) in the range of 50 kW to 2,000 kW.

2. FY2024 Surcharge Rate

* Monthly electricity consumption for ordinary households based on a survey of family income and expenditure conducted by the Ministry of Internal Affairs and Communications.

photo

(Breakdown)

  FY2022 assumptions FY2023 assumptions FY2024 assumptions Key factors
①Purchase costs, etc. 4.2033trillion yen 4.7477trillion yen 4.8172trillion yen
  • New renewable energy generation facilities that will go into operation in FY2024
  • Costs to ensure sufficient adjustments can be made to accommodate errors in predictions regarding renewable energy
②Avoidable costs, etc. 1.4609trillion yen 3.6353trillion yen 2.1322trillion yen
  • Estimating the unit prices of avoidable costs based on past actual market prices
③Amount of electricity sold 794.3billion kWh 794.6billion kWh 770.7billion kWh
  • Estimating electricity sales* based on actual figures in the past and the demand forecast by the OCCTO

*The amount of electricity covered by the surcharge rate in deductible expenses will be excluded.

Division in Charge

New and Renewable Energy Division, Energy Efficiency and Renewable Energy Department, Agency for Natural Resources and Energy

Related website